01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Detector Control System TOTEM / LHC J. Sziklai On behalf of the TOTEM Collaboration.

Slides:



Advertisements
Hasonló előadás
Getting started with intercultural dialogue - perspectives from HungaryAvviare il dialogo interculturale – prospettive nei musei ungheresiGetting started.
Advertisements

Bevezető Innovációs területek S+S Epilógus. pptPlex Section Divider Bevezető The slides after this divider will be grouped into a section and given the.
English version A sablon nyelvének választása: /Format/Slide Design /majd jobb oldalt válaszd a másik be- ágyazott sablont! Projekt logó beállítása: /View/Master.
Az Intel® Xeon® processzor 5500 sorozat
Tester Developer Architect Project Manager Business Analyst Designer Database Professional.
Nyereményjátékok és a Facebook - aki mer, az nyer!?”
2 3.NET Framework 3.0 Visual Studio Extensions for WF Visual Studio Extensions for WCF/WPF CTP ASP.NET AJAX 1.0 Ajax Toolkit.NET Framework 3.5 Visual.
21 Years of Partnership and Innovation 1989 Citrix Systems founded 2010 Citrix signed licensing agreement with Microsoft for NT Server Introduced Independent.
1 | 26 J. Csörgő 1, Cs.Török 1, T. Csörgő 23 1 ELTE University, Budapest, Hungary 2 Dept. Physics, Harvard University, Cambridge,
Optikai sugázrás hatása az emberi bőrre és szemre
What is the Mission Situation in Hungary?. Dr. György KOVÁCS What Is The Mission Situation In Hungary? Presentation Design by Ed Nickle – United World.
„ Bottom-up” cluster development and cooperation in Hungary Hungarian Confederation of Clusters and Networks Conference on cluster-cooperation in the V4.
The role of ARC in scaling up the Hungarian NGI Péter Stefán NIIFI NorduGrid 2011 May 9-12 Sundvolden, Norway.
ENEREA - Észak –Alföld Regional Energy Agency Gábor Vámosi Managing director.
Busch-Hungária Kft. Overview.
VHDL Fő témakörök: VHDL-en alapuló áramkörtervezés VHDL alapok
Bevezetés a tárgyakhoz Tárgyak  Objects are the containers for values of a specified type  Objects are either signals, variables or constants  Once.
FelültöltésVHDL Felültöltés (Overloading) n Áttekintés n Példák.
„21. századi közoktatás – fejlesztés, koordináció” TÁMOP / számú kiemelt projekt eTwinning: a digital touch in teacher training Klaudia.
Az erőátviteli rendszer
Infokommunikációs rendszerek 12
Infokom. rendsz. 11. előadás nov Kommunikációs rendszerek alapjai 11. előadás Rádiós adathálózatok Bluetooth, ZigBee, WiFi, WiMAX, Takács.
Infokommunikációs rendszerek 11
Course Situation and Event Driven Models for Multilevel Abstraction Based Virtual Engineering Spaces Óbuda University John von Neumann Faculty of Informatics.
The current Labour Market situation in Hungary and the new service structure of the Employment Service Presentation for the Delegation from Bosnia-Hercegovina.
Fénynél sebesebben? Kísérleti kétségek és remények ELTE, 2011 október 5.
Bevezetés a kísérleti részecskefizikába 2OO7.
RFFO TT Beszámoló 1. CERN-generál, LEP-L3, LHC-CMS-ALICE-construction, SPS-NA49/NA61 Előadó: Vesztergombi Gy. 35' + 5' diszkusszió 2.
RMKI TT Sziklai János MFFO TOTEM HU az LHC-nél Sziklai János A TOTEM-Magyarország nevében (K. Eggert, TOTEM Spokesman és Csörgő Tamás előadásai)
CMS HU Budapest Sziklai János RMKI TOTEM / LHC & DCS Sziklai János RMKI TOTEM kollaboráció.
KÖZÉP-ÁZSIA:A GREAT GAME- MASODIK FELVONÁS Tamás Pál MTA SZKI.
Service Manager.. Remedy Action Request System OpenView Operations.
Alertet indíthat egy: SQL Server esemény (LOG) SQL Server performancia érték WMI events Alert végezhet: Operátor értesítést JOB indítás (válasz az eseményre)
Projektmunka az NI-nál
Elektroanalitikához segédábrák Az ábrák több, részben szerzői jogokkal védett műből, oktatási célra lettek kivéve. Csak az intranetre tehetők, továbbmásolásuk,
Szervező program Pénzügy figyelő, számlázó program Legújabb alkalmazás.NET Framework 2.0 WSE.NET Framework 4.0 WCF Régebbi, jól bevált alkalmazás.
Kajcsos Zsolt MTA KFKI Részecske-és Magfizikai Kutató Intézet Nagyspinű és kisspinű állapotok tanulmányozása pozitrónium kölcsönhatások által.
Atomerőművi reaktor töltettervezése, fűtőelem átrakás, reaktorfizikai korlátok, indítási mérések Nemes Imre, Beliczai Botond PA Zrt.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks P-GRADE Portal gyakorlat ismertető Gergely.
HP-SEE High-Performance Computing Infrastructure for South East Europe’s Research Communities Kozlovszky M. The HP-SEE initiative is co-funded.
Teachers as key stakeholders of ICT in Hungarian schools Andrea Karpati, Eotvos University, Budapest
Könyvtár, csomag és alprogramokVHDL Könyvtár, csomag és alprogram n Library és use n Package n Alprogramok –Procedure –Function –Resolution function Egy.
Termikus szimuláció kiegészítés. Heat equation Boundary conditions ­second kind (Neumann) ­third kind (Robin) ­first kind (Dirichlet)
Budapesti Műszaki és Gazdaságtudomanyi Egyetem Elektronikus Eszközök Tanszéke 1 Tokozások termikus tesztje, minősítése.
Multilingual websites in Hungary Gabriella Szalóki Egy előadás könnyen vitára ösztönözheti a hallgatóságot. A PowerPoint bemutatók használatával azonban.
Készült az ERFP – DD2002 – HU – B – 01 szerzősésszámú projekt támogatásával Chapter 9 / 1 C h a p t e r 9 Semi-Rigid Connections in Steel Construction.
Készült az ERFP – DD2002 – HU – B – 01 szerzősésszámú projekt támogatásával Chapter 7 / 1 C h a p t e r 7 Behaviour of Plate Elements of Steel Frames.
Készült az ERFP – DD2002 – HU – B – 01 szerzősésszámú projekt támogatásával Chapter 6 / 1 C h a p t e r 6 Elastic Critical Plate Buckling Loads.
Készült az ERFP – DD2002 – HU – B – 01 szerzősésszámú projekt támogatásával Chapter 1 / 1 C h a p t e r 1 Introduction.
A magyar nyelv nagyszótára ‘Comprehensive Dictionary of Hungarian’ (Dictionary of the Academy) A brief history Tamás Péter Szabó Department of Lexicography.
- Group Policy - Group Policy Preferences - Group Policy 4x5 - Optimális munkakörnyezet – az első lépcsőfok.
EUDOC Database System in the Hungarian National Assembly Eszter Kertészné-Gérecz ECPRD/2006. Vilnius.
New Horizons in Brain Research & Gendered Innovation VALÉRIA CSÉPE Brain Imaging MTA RCNS, Budapest.
Web Application 1 Web Application 3 Web Application 2 Web Application 4 Shared Service Provider 1 Shared Service Provider 2 Excel Services1 Search1.
Technological investigation of Early Neolithic pottery from Vörs, South-West Hungary Gherdán, Katalin* - T. Biró, Katalin** - Szakmány, György* - Tóth,
General Motors Powertrain – Magyarország Kft. Dátum: Április 16
Fej irányultságának becslése Ügyféltérben gyanús viselkedés jelzéséhez Kültéren kiegészítő hő szenzor szükséges.
DECENT PROJEKT D eveloping E mployees C apacity through E uropean and N ational level T rainings.
Magyar Orvostanhallgatók Egyesülete Hungarian Medical Students’ International Relations Committee The Committee about 1000 members in Hungary 4 Local.
D2A Pathway 2: End of Life Care – Home (usual place of residence)
Elmech Standards Workshop Content
Systems Hardware Business challenge
TECHNICAL TRAINING December 2012.
August 22, 2017 Seating Challenge Color Personality
What would x have to be in order for the mean to be 8?
Eastern Analytical Symposium, Princeton NJ
Developing, understanding and using nutrient boundaries
Antibiotic Drug Prescription
The cardiac cycle and pressure changes
Dalit Shental-Bechor, Turkan Haliloglu, Nir Ben-Tal 
Előadás másolata:

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Detector Control System TOTEM / LHC J. Sziklai On behalf of the TOTEM Collaboration

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS TEAM Coordinator: Paolo Palazzi Steering Board:Ivan Atanassov Federico Ravotti Fernando Lucas Rodriguez* Sami Heikki Sakari Stoeckell * ”Design, Development and Verification of the Detector Control System for the TOTEM experiment at the CERN LHC” PhD thesis, Universidad de Sevilla, October 2009 The TOTEM DCS project follows the usual non-hierarchical, collaborative and informal style of HEP experiments, enhanced with a structured approach inspired by current practices in European Collaborative Space Projects [ Using the Goal Directed Project Management (GDPM) as planning methodology Using the future Subversion based Software Version Control at CERN replacing the currently used CVS system. Using several tools based on Information Technology developments (Use case, UML State model, etc.)

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM Hungary TOTEM (1997-) és Totem-Hungary (2006-) History: Initiative: April 2006 Acceptance byTOTEM Executive Commitee: May 2006 TOTEM Spokesperson Budapest visit: December2006 Hungarian research starts (TOTEM fund): January 2007 OTKA és OTKA NKTH success in funding:March 2008 TOTEM Coll. Board votes for full membership:April 2008 TOTEM-Hungary MoU signature, LHC RRB: November 2008

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI  Measuring the total cross-section with an absolute error of 1 mb by using the luminosity independent method. This requires the simultaneous measurement of the elastic pp scattering down to the four-momentum transfer of -t  GeV 2 and of the inelastic pp interaction rate with an adequate acceptance in the forward region;  Measuring elastic proton scattering over a wide range in momentum transfer up to -t  10 GeV 2 ;  Measuring diffractive dissociation, including single, double and central diffraction topologies using the forward inelastic detectors in combination with the CMS detector. Main TOTEM Physics Goals:

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI  Diffractive process classes and cross sections (Tevatron measured at 1.8 TeV, LHC estimated at 14TeV) Diffractive processes

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM IP5 ~14 m CMS T1:  3.1 <  < 4.7 T2: 5.3 <  < m T1 T2 HF Inelastic detector configurations no both side of IP5: all capable for tracking and trigger Roman Pots: measuring the elastic & inelastic protons closed to the beam Inelastic telescopes:identifying charged particles in inelastic events & vertex reconstruction T1: 3.1 <  < 4.7 T2: 5.3 <  < 6.6 T1: 18 – 90 mrad T2: 3 – 10 mrad IP5 RP: 5 – 500  rad - beam optics dependent

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM capabilities Unique possibility of detecting charged particles with high pseudorapidity Ideal tool for studying forward phenomena (elastic & diffractive scattering) In case of inelastic events the energy flow and the multiplicity increases in forward angles The acceptance coverage of the CMS and TOTEM experiment

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM Detectors

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI CMS & TOTEM

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI T1 telescope CSC (Chatode Strip Chambers) 5 layers of CSC chambers with decreasing diameters 2 x 3 trapezoid shaped CSC (Chatode Strip Chambers) detector elements

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI T1 telescope - details

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI T2 Telescope GEM (Gas Elecron Multiplier) Castor Collar Castor T2 GEM 10 tripple GEM layers on bothe sides of the IP to tolerate high particle fluxes in 5.3 < |  | < 6.6 pseudorapidity range Design & installation together with CMS Final GEM chamber Beam

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI T2 Telescope in test beam

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Roman Pot detectors Special movable detector assembly in its own separate vacuum space Roman Pot pairs at a distance of 4 meters at 147 és 220 m from IP

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Horizontal Pot Vertical Pot BPM Roman Pots Motorization Developed by CERN Mechanical arm that moves towards the proton beams Its operation must be “safe” for the LHC accelerator An incident with Roman Pots shutdown Fermilab for 2 months in 2003

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Close collaboration with the LHC Roman Pots in the LHC tunnel

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI  The DCS will be a slave to the Run Control and Monitor System (RCMS) which will be in charge of the overall control and monitoring of the data-taking process  The primary function of the DCS is the overall control of the detector status and its environment  DCS has to communicate with external entities: the RCMS, the accelerator, DAQ, motorization, etc.  DCS has to control and monitor the systems regulating the environment at the experiment, tasks traditionally referred to as “Slow Controls” e.g.: – Handling the supplies of electricity to the detector (HV, LV) – Environment monitoring (temperature, radiation, vacuum, humidity,../) – Other DCS-related detector electronics (e.g. calibration systems) – Control of the cooling facilities and the overall environment near the detectors – Supervision of all gas and fluid handling and cooling subsystems – Control of all racks, crates and access control TOTEM DCS Objectives

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS connections

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI DATAFLOW

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS connections

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS Software/Hardware levels

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS PVSS II Commercial SCADA (Supervisory Control and Data Acquisition) software for Windows and Linux Very scalable. Each process can run in a different computing node, mixing operating systems. Good performance on distributed systems. Can be extended using “scripts” and binary libraries.

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS Development process

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM Hardware Overview Diagrams

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM Hardware Overview Diagrams

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM Hardware Overview Diagrams

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM Hardware Overview Diagrams

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS Development process

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Operation Logic: FSM Low Voltage/UML

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Operation Logic: FSM High Voltage

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Operation Logic: FSM High Voltage/UML

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI FSM State/Command Hierarchy

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS Development process

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM Detector Tree

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM Hardware Tree

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI PBS & Naming Roman Pot

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI PBS T1

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI PBS T2

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Pinout Tables Roman Pot

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Pinout Tables Roman Pot

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Pinout Tables Roman Pot

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Pinout Tables Roman Pot

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Pinout Tables Roman Pot

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Pinout Tables Roman Pot

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Pinout Tables Roman Pot AUTOMATED

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM FSM Hierarchy Table

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM FSM Hierarchy Table AUTOMATED

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS Development process

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM DCS Conclusions  Formalization for the hardware layout and operation logic  This is allowing automatic developments, verification and establishing a software life-cycle.  In this way all the front-end connectivity and FSM hierarchy is generated via automatic procedures.  In case of development errors, it is only necessary to modify the automatic generation script. This saves months of work and human resources!

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI TOTEM Main Screen (Alice) Live DEMO

01/12/2009 Budapest Zimányi 2009 J. Sziklai MTA KFKI RMKI Questions